Things are moving along very fast at the house these days. It looks more and more like a home every time we stop by to look at the progress.

The painters have finished painting all of the rooms and trim (check out the colors in the picutes). The hardwood floors have been standed and stained (you can all see them in the pictures). Almost all of the trim work has been completed, including the stairwell handrails. They also put the stone on one of our fireplaces last week.

On the outside of the house, we now have a concrete driveway and a VERY long public sidewalk.

They are working on the bathroom tile today. If the weather holds out, they are going to pour our front sidewalk and rear patio soon. I think (cross your fingers) that the kitchen and bathroom cabinets are going to start installation on Friday. Then, they will start installing the granite tops.

By next week, they might start installing the lighting fixtures and the plumbing fixtures will soon follow. Carpet will be the week or two after that.
Overall, things are progressing very well.